Posts

Showing posts from October, 2024

weak bridge at babayara, madina in Accra partially built

Image
the new concret bridge  The frail bridge at Babayara, a Community in madina has been partially reconstructed.  This bridge connects two schools-Babayara Primary and Babayara Junior High School. It used to be a metal bridge that lost its stregth and became a death. But the newly build one is made of concete. It now has a formidable concrete flood but lack guard rails on the sides to prevent pedestrains from tumbling over. the new concret bridge  Besides the pupils of the two schools Members of  the Babayara  also use it as thorough fare to reach other communities within madina enclave especillly Ogbojo New market and Nsamanpom  The old metal bridge