weak bridge at babayara, madina in Accra partially built

the new concret bridge 

The frail bridge at Babayara, a Community in madina has been partially reconstructed.  This bridge connects two schools-Babayara Primary and Babayara Junior High School. It used to be a metal bridge that lost its stregth and became a death. But the newly build one is made of concete. It now has a formidable concrete flood but lack guard rails on the sides to prevent pedestrains from tumbling over.
the new concret bridge 
Besides the pupils of the two schools Members of  the Babayara  also use it as thorough fare to reach other communities within madina enclave especillly Ogbojo New market and Nsamanpom 


The old metal bridge

 

Comments